What is Technical Guide used in Project Planning & Scheduling?
Asked 4 months ago | Viewed 144times
0

How does the role and function of a "Technical Guide" in project planning and scheduling differ across different project types (e.g., software development, construction, scientific research) and how do these differences influence the specific skills and expertise required for the role?

comment question
1 Answer(s)
0

The term "Technical Guide" is a bit broad when it comes to project planning and scheduling. There's no single document universally known as a "Technical Guide". However, several tools and resources fall under this umbrella. Here's a breakdown:

1. Technical Specifications & Documents:

  • Product Specifications: Detailed descriptions of the features, functionalities, and technical requirements of the product or service being developed. This is essential for understanding the project's scope and complexity.
  • Technical Design Documents: Outlines the architecture, system design, and technical implementation details of the project. These documents guide the development team.
  • Software Requirements Specification (SRS): For software projects, this document outlines the functionality, performance, and user interface requirements.
  • Hardware Specifications: Lists the specific hardware components needed for the project, including their configurations and performance characteristics.

2. Technical Standards & Guidelines:

  • Industry Standards: These are established rules and best practices for specific industries or technologies. For example, coding standards in software development or safety regulations in construction.
  • Company Policies: Internal guidelines and regulations specific to the organization. These can include policies on data security, risk management, or project management methodologies.

3. Technical Skills & Expertise:

  • Technical Expertise: The project team should have the necessary technical skills and knowledge to understand and implement the project's requirements. This includes expertise in programming, database management, network security, or specific software or hardware platforms.

4. Technical Tools & Software:

  • Project Management Software: Tools like Jira, Asana, or Microsoft Project help with planning, scheduling, task management, and tracking progress.
  • Collaboration Tools: Platforms like Slack, Teams, or Zoom facilitate communication and collaboration within the project team.
  • Technical Documentation Tools: Software like MadCap Flare or Adobe RoboHelp helps create and manage technical documentation, user manuals, and training materials.

In Project Planning & Scheduling, these "Technical Guides" are crucial for:

  • Defining the Project Scope: Clearly outlining what needs to be done and what technical constraints apply.
  • Estimating Time & Resources: Understanding the technical complexity helps estimate how much time and effort will be required.
  • Risk Management: Identifying potential technical challenges and risks helps in developing mitigation strategies.
  • Team Collaboration: Ensuring everyone is working from the same technical specifications and guidelines.
  • Quality Control: Using technical standards and best practices to ensure that the project meets the required quality levels.

Therefore, when referring to a "Technical Guide" in project planning and scheduling, it's important to specify what type of information is being discussed. It could be technical specifications, standards, skills, or tools. Understanding the specific context will ensure clear communication and a successful project execution.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is the scientific classification of an atom?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back