What is Individual Activity Cost used in Reservoir Engineering?
Asked 3 months, 2 weeks ago | Viewed 74times
0

How does the concept of Individual Activity Cost (IAC) in reservoir engineering help optimize well and field development strategies, considering the interplay between factors like well completion, production rate, and reservoir heterogeneity?

This question probes into the following aspects:

  • Definition and application of IAC: What exactly is Individual Activity Cost, and how is it calculated in the context of reservoir engineering? What specific activities are considered?
  • Optimization strategies: How can understanding the IAC for different activities contribute to optimizing well and field development strategies? This could include well placement, completion design, production rate decisions, and the overall development plan.
  • Interplay with other factors: How does the IAC concept interact with factors like reservoir heterogeneity, well completion methods, and production rates? For example, does a higher IAC in a particular area justify the use of more expensive but potentially more efficient completion methods?
  • Integration into decision-making: How can the IAC be used in conjunction with other reservoir engineering tools and methodologies to make informed decisions about well development and production?

This question encourages a comprehensive understanding of the IAC and its role in optimizing reservoir development, considering the various factors that influence cost and efficiency. It also invites a discussion about the practical application of this concept in real-world scenarios.

comment question
1 Answer(s)
0

Individual Activity Cost (IAC) in Reservoir Engineering:

Individual Activity Cost (IAC) is a crucial concept in reservoir engineering, particularly in the context of economic evaluation and decision-making regarding field development plans. It's not a single, fixed value, but rather a methodology for assessing the cost of each individual activity associated with a reservoir development project.

Here's a breakdown:

What is IAC?

  • IAC involves breaking down a reservoir development project into its individual components (activities).
  • For each activity, the associated costs are meticulously determined, considering factors like:
    • Labor: Skilled and unskilled personnel, including engineers, technicians, and field workers.
    • Materials: Equipment, chemicals, drilling fluids, casing, cement, and other materials.
    • Services: Transportation, logistics, catering, and specialized services like well testing.
    • Overheads: General and administrative expenses, taxes, insurance, and profit margin.
  • IAC considers time-dependent factors like inflation and escalation of costs over the project lifecycle.
  • The sum of all individual activity costs constitutes the total project cost.

Why is IAC important?

  • Detailed cost analysis: IAC provides a granular view of project costs, allowing for better understanding of cost drivers and optimization opportunities.
  • Economic feasibility: Comparing IAC with potential revenue streams helps assess the project's financial viability and profitability.
  • Decision-making: IAC aids in choosing the most economical development strategy and identifying areas for cost reduction.
  • Sensitivity analysis: Evaluating IAC under different scenarios helps assess project risk and understand the impact of uncertainties on the project economics.
  • Investment justification: A thorough IAC analysis provides a solid foundation for justifying investments in reservoir development projects.

Example:

Consider a typical oil and gas development project:

  • Activities: Drilling wells, installing surface facilities, production operations, and decommissioning.
  • IAC components:
    • Drilling: Drilling rig, mud, casing, cement, labor, and services.
    • Surface facilities: Pipelines, separators, tanks, pumps, and construction labor.
    • Production operations: Labor, maintenance, chemicals, and utilities.
    • Decommissioning: Well plugging, site cleanup, and equipment disposal.

Note:

IAC is a complex and iterative process, often involving specialized software and expertise from cost engineers and reservoir engineers. The level of detail and accuracy of the IAC analysis depend on the project's complexity, scale, and the stage of development.

In conclusion, Individual Activity Cost is an essential tool for reservoir engineers to accurately estimate project costs, evaluate economic feasibility, and make informed decisions regarding reservoir development strategies.

comment Answer

Top viewed

How to calculate piping diameter and thikness according to ASME B31.3 Process Piping Design ?
What is the scientific classification of an atom?
What is Conductivity (fracture flow) used in Reservoir Engineering?
How to use Monte Carlo similation using python to similate Project Risks?
What is a neutron?

Tags Cloud

neutron electron proton atome three-phase electrical 220V Conductivity flow fracture reservoir Commitment Agreement planning Technical Guide scheduling bailer drilling Storage Quality Control QA/QC Regulatory Audit Compliance Drilling Completion logging Heading Well Offsite Fabrication Éthique Probabilité erreur intégrité Gestion actifs indexation Outil Zinc Sulfide/Sulfate Gas Oil Triple Project Planning Task Scheduling Force RWO PDP annulus Hydrophobic General Plan Testing Functional Test Density Mobilize Subcontract Penetration Digital Simulation tubular Processing goods Sponsor Network Path, Racking ("LSD") Start Medium Microorganisms Backward Engineering Reservoir V-door Water Brackish pumping Scheduled ("SSD") Safety Drill Valve Status Schedule Resource Level Chart Gantt Training Formaldehyde Awareness elevators Estimation Control Pre-Tender Estimate Current budget (QA/QC) Quality Assurance Inspection In-Process Concession (subsea) Plateau Impeller retriever Appraisal Activity (processing) Neutralization Source Potential Personal Rewards Ground Packing Element Liner Slotted Conformance Hanger Instrument Production (injector) Tracer Facilities (mud) Pressure Lift-Off Communication Nonverbal Carrier Concurrent Delays slick Valuation Leaders Manpower Industry Risks Management Incident Spending Investigation Limit Reporting test) (well Identification Phase Programme Vapor World Threshold Velocity lift) Particle Benefits Compressor Painting Insulation Float ("FF") Statistics element Temperature Detailed Motivating Policy Manual Emergency Requirements Response Specific ("KPI") Terms Performance Indicators Qualifications Contractor Optimistic Discontinuous Barite Clintoptolite Dispute Fines Migration Pitot Materials Procurement Evaluation Vendor Contract Award Assets Computer Modeling Procedures Configuration Verification Leader Phased clamp safety (facilities) Considerations Organization Development Competency Trade-off Tetrad Off-the-Shelf Items hazard consequence probability project Python Monte-Carlo risks simulation visualize analyze pipeline ferrites black-powder SRBC Baseline Risk tubing Diameter coiled Emulsifier Emulsion Invert Responsibility Casing Electrical Submersible Phasing Finish Known-Unknown Curvature (seismic) Pre-Qualifications Exchange Capacity Cation MIT-IA Depth Vertical Pulse Triplex Brainstorming Log-Inject-Log Managed GERT Nipple Cased Perforated Fault Software Staff System Vibroseis radioactivity Product Review Acceptance Capability Immature Net-Back Lapse Factor Specification Culture Matrix Staffing Effort Cement Micro Letter Fanning Equation factor) friction ECC WIMS Bar-Vent perforating meter displacement FLC Information Flow connection Junk Static service In-House OWC BATNA Curve Bridging depth control perforation Doghouse Scope Description D&A E&A Effect Belt Architecture wet DFIT Magnitude Order LPG Contractual Legal Electric Logging CL Drawing Logic Semi-Time-Scaled IAxOA CMIT Expenditures Actual opening Skirt access (corrosion) Passivation Blanking Performing Uplift Underbalance Communicating Groups SDV Fluid Shoot Qualification Spacing Hydrofluoric Shearing basket Construction Systems Programmer Individual Activation Layout organophosphates Deox Fourier A2/O botanical pesticide EAP colloidal Displacement process GPR Relationship SOC Constraint Prime Gathering Tap CM Subproject Oil-In-Place Percentage time-lag accumulator compounds aliphatic vapor evaporation compression echo فنى # psvs

Tags

-->-->
Back